Reporting
Contents
Reporting overview
EasyBoards® allows to rapidly access to reporting related to Kanban use. Reports are launched from the Reports command available in each board (so from the boards).
The available reports are:
- Work in Progress
- Lead Time
- Throughput
- Issues
- Flow Efficiency
- Quality
- Due Date Performance
Many reports are generated using statistical information of cards (Commitment Point, Work in Progress, Delivery Point, Working Time, %:, Defective). Statistical information can be viewed in the Statistics form of a card, see Cards details and settings for more details. They are automatically set by the system when a card is moved in lanes, based on lanes settings, see Options form details in Lanes settings. For example, when a card is moved to a lane labelled as "Commitment Point", the card Commitment Point date and time is set accordingly. However, they can also be manually edited in card by board members with the required privilege.
Work in Progress
This report shows the Work in Progress for the board. It briefly shows the cumulative trends of committed (work that has to be done) and delivered (work completed) cards. The difference is the work in progress that, in a Kanban system, should be limited and controlled.
In a period, x-axis point, the cumulative number of cards with Commitment Point in the period or before (if not delivered) and the cumulative number of cards with Delivery Point in the period on top of the previous are plotted.
Cards can be filtered in the report considering card Priority.
Lead Time
Lead time is the time elapsed between the Delivery Point date time and Commitment Point date time set in the card. This time is calculated considering working hours only if the working calendar is set, see Working Calendar for more information.
In the report:
- a dot is printed per period (x-axis point), being the average lead time of all the cards completed (Delivery Point in the period) in that period; cards considered shall also have Commitment Point and Delivery Point between selected report start and end date;
- a dot is printed for each selected card Priority;
- if targets Lead Time are defined, the corresponding defined values are reported in the report. See board command Target, in Board commands.
Throughput
Throughput is the number of cards completed in a period (Delivery Point in the period, x-axis points). Additionally, the cards considered in a a period are those with Commitment Point date within the reporting period, determined by the selection of report start and end date. Data can be plotted by card Priority.
Issues
This reports shows the number of work in progress cards and the number of issues in time. Issues are the cards that are blocked.
Work in progress cards in a period (x-axis point) are those with:
- Work in Progress date within the reporting period or before with no Delivery Point date yet
plus
- Work in Progress date within the reporting period or before with Delivery Point date in the reporting period or after
Issue cards are those in status blocked and are reported in all the periods including and after the blocking date. The blocking date is defined by the Block command in the card, see Cards commands.
Flow Efficiency
This reports shows the flow efficiency, calculated based on the percentage of working time as defined in the card, see Working Time % in Cards details and settings.
Per each report periot (x-axis point), the average of Working Time % for the cards with Delivery Point date in the period is plotted.